Precision and Perfection: Executing a Flawless Tile Installation Project
The execution of this order was carried out in several stages. During the meeting with the customer, it was not yet completely clear which tile should be installed on the floor. The customer hesitated between several options. During the discussion of the order and advice from our experienced employees, it was decided that it is more appropriate and better to install this type of tile.Before installing the tiles, we performed work on leveling the floor covering (Self leveling). Next, the floor was treated with a softening agent to prevent cracks and we started directly installing the tiles. The peculiarity of the execution of this order is that the tiles must be installed perfectly, and any cuts of the tiles must be precise, because any, even the smallest mistake, will be visible on the floor. The entire work (48 m2) was completed in 8 days.
The work, as always, was done perfectly (like all our works). All thanks to the professionalism of our team.