Plastering
North London, UK
9 days

Masterful Plastering: Elevating Interior Repairs with Precision and Efficiency

Plastering is an important stage in the complex of internal repair works. The duration of painting and decorating walls and ceilings depends on the quality of plastering. Our approach to this work is, first of all, a detailed inspection of the walls (old brick walls, new plasterboard walls and ceilings), how level they are and whether they need additional leveling.
A meeting and a detailed inspection of the walls and ceilings were held with the customer. Since the walls were old (old brittle brick), were uneven and the ceilings were new (plasterboards), it was decided to coat the walls with PVA mortar and level the walls with Hardwall and construction mesh, which was installed on the walls and ceilings.
The presence of Velux Windows on the ceilings requires additional time and meticulousness in plastering. But the result is, as always, perfect ceilings and walls.
All the work on the preparation of walls and ceilings, and plastering of 250 m2 (the entire building) took 9 days. The quality and speed impressed the customer, as the order was completed faster than planned.

Calculate Your Price: Uncover Cost with Our Handy Tool!

Working hours

Monday-Friday:

08.00am to 5.00pm

Saturday:

9.00am to 3.00pm

Sunday Closed

Quick Enquiry Form

    Our Services

    Copyright © 2025 Sky Level Constructions LTD. All rights reserved.

    Maidstone, ME14

    We use cookies to personalise content and ads, to provide social media features and to analyse our traffic. We also share information about your use of our site with our social media, advertising and analytics partners. View more
    Accept