Revitalizing Plumbing Infrastructure: Overhauling Outdated Systems and Ensuring Quality in East London Residence
On the recommendation of one of our previous customers, a client from the eastern part of London approached us to perform plumbing work in a house where all the pipes, water heaters and radiators of the old type were installed and they did not work well.After inspecting the house and studying the work plans, our specialists made some recommendations and made changes to the plans, and we began to execute the order. We carried out a complete dismantling of the water supply and sewage pipes of the house. We carried out removal of old radiators and dismantling of the old gas boiler. New copper water pipes were installed, new sewer pipes were installed. A new gas boiler was installed and pipes were installed for underfloor heating in the kitchen and bathroom. Additionally, a faucet was installed outside to be able to use it to water the plants in the backyard.
Of course, we were given a certificate for the work we did and a guarantee of the quality of the work we did. The order was completed in 13 days. The result is that all the equipment works flawlessly and, of course, the customer is satisfied with the quality work